——夜间施工噪音扰民
来信人:
您好!来信收悉,市政府立即责成xx区政府核处,现就有关情况报告如下:
接到来信反映后,区环保局于20xx年6月6日针对该公司作业时产生的噪声污染进行了现场专项检查,
一、基本情况
重庆首溪建材有限公司位于xx区万古镇曹家村*组,法定代表人***,主要从事建材材料混凝土生产及销售。检查当日,该公司正在生产。现场生产线、堆料场物料全封闭,生产废水不外排。该公司在生产时料场有噪声产生,按照环境影响报告表内容采取了的隔音降噪措施,并通过了区环保局竣工验收。但由于该公司距离附近居民较近,夜间生产时的\'车辆等产生的噪声对周边住户有一定影响。
该公司办有工商、税务等手续,办有排污许可证(20xx.9.1—20xx.8.31渝(足环排证(声〔20xx〕058号,排放时间为8:00—22:00,噪声限值为60分贝。
二、处理情况
责令该厂加强管理,确保污染物达标排放,噪声排放严格按照排污许可证要求,夜间10点后严禁开展生产作业。
区环保局将加强对该公司的监管,以减轻该公司作业时对周边住户的影响。
Florence Trunkemeyer
College of Business
Ball State University
Muncie, IN 47300
November 15, 1998
General Computer Corporation
Engineering Department
P.O. Box 73219
Fort Worth, TX 76108
Dear Sir:
With reference to our order No. W 98, the 120 computer sets supplies to the above order were delivered the day before yesterday, but we regret that 20 sets were badly damaged.
The packages containing the computer sets appeared to be in good condition and we accepted and signed for them without question. We unpacked the computer sets with care and can only assume that damage must be due to careless handling at some stage prior to packing.
We shall be glad if you will replace all 20 sets as soon as possible. Meanwhile, we have put the damaged computer sets aside in case you need them to support a claim on your suppliers for compensation.
Yours sincerely,
(Signature
Sunny Company
34 Zhongcheng Road
Jinlian Building
Shanghai
September 12, 2001
Sales manager
Elegance Clothing Company
45 West Street, Nanjing
Jiangsu Province
Dear Mr. Chang:
On September 10, our order for 280 women?s cotton sweaters was duly received, but we regret to say that 40 cotton sweaters in white color were seriously soiled.
We had the case investigated immediately, and the result shows the damage was due to improper packing, for which the suppliers are definitely responsible.
Needless to say, we have suffered a great loss from this, as we cannot sell the sweaters in this condition to our customers. We ask you to conduct investigation at your end and reply to us.
Sincerely yours,
Sunny Lee
Manager
Florence Trunkemeyer
College of Business
Ball State University
Muncie, IN 47300
November 15, 1998
General Computer Corporation
Engineering Department
P.O. Box 73219
Fort Worth, TX 76108
Dear Sir:
With reference to our order No. W 98, the 120 computer sets supplies to the above order were delivered the day before yesterday, but we regret that 20 sets were badly damaged.
The packages containing the computer sets appeared to be in good condition and we accepted and signed for them without question. We unpacked the computer sets with care and can only assume that damage must be due to careless handling at some stage prior to packing.
We shall be glad if you will replace all 20 sets as soon as possible. Meanwhile, we have put the damaged computer sets aside in case you need them to support a claim on your suppliers for compensation.
Yours sincerely,
(Signature
© 2022 xuexicn.net,All Rights Reserved.